Modular Salon Wall Systems An Allied Modular Company
866-TAN-WALL (866) 826-9255
Easy Assembly

This example is to show you how easy our wall systems is to install. In this example, our installer is adding on a room to an existing modular wall. (point to pictures to enlarge)
1) The floor track is layed out and attached to floor.
6) Next, a corner connecting post is installed.
2) The wall start is then attached to existing wall.
7) And the last panel is then put in.
3) The 1st panel is then put into place.
8) Top channel is then installed over the panels and posts. (Note: All aluminum is pre-cut and mitred at factory.)
4) Next,the connecting post is then put in.
9) Last piece of top channel is then installed.
5) A door panel is set into place. (Note: Door panels are pre-cut and frame is installed at factory.)
10) Last step, supplied #8 self tapping tek screws are then used to hold framing together..